Bathrooms Done Right, Behind the Tile Too

Bathroom remodels in Waldorf, MD — tile, vanities, walk-in showers, fixtures, proper waterproofing. The pretty part matters, but the hidden work matters more.

☎ Call (240) 810-2174

Get a Free Estimate

Tell us about your project. Free estimates, no pressure.

Call or text now
(240) 810-2174
Serving Waldorf, MD and surrounding Charles County, Southern Maryland, and the DMV
Modern bathroom remodel with walk-in shower by EZ Renovations in Waldorf MD

Small room, high stakes

A bathroom is the smallest room we remodel and one of the most technical. Every surface gets wet. Every seam is a potential leak. The difference between a bathroom that looks great for fifteen years and one that grows mold behind the tile in three is entirely in the hidden work: waterproofing membranes, proper slope to the drain, sealed penetrations, ventilation that actually moves air. We do all of it, to code, with permits.

What we remodel

Hall bathrooms

The workhorse bath — tub/shower combo to walk-in shower conversions, new vanity, tile, fixtures, lighting. The highest-impact refresh in most homes.

Master suites

Double vanities, walk-in showers with bench and niche, freestanding tubs, heated floors. Layout changes, moving plumbing — the full suite, planned on paper before demo.

Powder rooms

Small space, big impression. The powder room is where guests judge your house — a sharp vanity, good mirror, and proper lighting go a long way for a modest budget.

Accessibility upgrades

Curbless showers, grab bars that are actually anchored to blocking (not just screwed to tile), comfort-height toilets, handheld showers. Remodel once, age in place comfortably.

The waterproofing we insist on

Behind every shower and tub surround we install a proper waterproofing system — membrane on walls, sealed corners and penetrations, sloped shower pan or pre-sloped base. Tile is not waterproof; grout is not waterproof. The membrane is what keeps water out of your walls and subfloor. Any contractor who tiles directly over drywall in a wet area is building you a future tear-out. We do not do that.

Tile, vanities, fixtures

We set tile tight with consistent grout lines — floors, walls, niches, shower benches. Vanities from stock to custom, installed level and scribed to the wall. Fixtures from the brands with parts you can actually buy in ten years. We will talk through where to spend (shower valve, waterproofing) and where to save (decorative tile accents).

How long it takes

A hall bath is usually two to three weeks. A master suite with layout changes runs three to five. Tile setting and curing cannot be rushed — thinset needs its time. See our cost and timeline guide.

What it costs

Hall baths in our area often land in the $10K–$20K range; master suites with layout changes and premium tile run higher. Tile and fixture selections swing the number more than anything else.

A note on prices: material and labor costs move up and down, and no two projects need the same work. Treat any numbers on this page as starting points, not quotes. Your written estimate after our free visit is the real number for your project.

One-bathroom homes

If the bathroom we are remodeling is your only one, we plan around it: tight scheduling, clear daily milestones, and honest talk about the days you will need another option. We have done this many times — it is manageable with a real plan.

EZ Renovations LLC — MHIC #161062, EPA Lead Certified, licensed, insured & bonded.

Get your free estimate

Call (240) 810-2174 or send the form. We come look, measure, talk through what you want, and give you a written price — free, no pressure.

Frequently Asked Questions

How long does a bathroom remodel take?

Two to three weeks for a hall bath, three to five for a master suite with layout changes. Tile curing time is part of the schedule — it cannot be rushed.

Can you convert my tub to a walk-in shower?

Yes — it is one of our most common projects. We handle the drain, the waterproofing, the tile, the glass, and the plumbing.

What is behind my shower walls now?

We find out before we quote. Older installs often hide water damage or tile-over-drywall. We open it up at the estimate stage so the price accounts for reality.

Do I need a permit for a bathroom remodel?

If plumbing or electrical moves, yes — and we pull it. Cosmetic-only refreshes usually do not need one. We handle the determination.

Can you make my bathroom more accessible?

Yes. Curbless showers, properly anchored grab bars, comfort-height fixtures — planned for safety without looking institutional.

☎ Call (240) 810-2174